Successfully delivered a 22-week programme involving the installation of 7.2 km of 250 mm HDPE water main, including pressure testing, chlorination, de-chlorination, and bacteriological sampling.
Project Highlights
- 7.6 km of 250 mm HDPE water main installed within a 22-week programme.
- Complex HDD crossing successfully completed beneath the River Alde.
- Maintained continuous water supply through live network interventions.
- Facilitated environmental and archaeological compliance through strategic trial-holing operations.
- Delivered civil, mechanical, and utility infrastructure associated with a new booster installation.
- Successfully commissioned reinforcement infrastructure to improve network resilience and supply security.
Key responsibilities and achievements included:
- Managed the delivery of 7.6 km of 250 mm HDPE water main infrastructure as part of a strategic reinforcement scheme between Fressingfield Tower and Benhall Water Treatment Works.
- Designed and delivered a 100 m Horizontal Directional Drill (HDD) beneath the River Alde, installing a 250 mm HDPE water main whilst minimising environmental impact and avoiding disruption to the watercourse.
- Planned and completed multiple trial-hole investigations to facilitate archaeological and environmental assessments along the route, ensuring compliance with stakeholder and regulatory requirements.
- Installed and drilled a 15-inch under-pressure tee connection, maintaining continuous customer supply and eliminating the need for operational impacts at the Water Treatment Works.
- Constructed a 4 m x 4 m reinforced concrete plinth to accommodate a booster installation, and housing including associated electrical ducting, chambers.
- Coordinated testing, commissioning, and final connection activities to ensure successful integration into the existing network.